Cristina D. ullmann

LOCAL PROJECT EXPERIENCE

  • Project worked as part of a Project Team or Project Lead under employment at another firm
  • Edmonds Community Hub, 7135 Walker Ave & 7244 Arcola St, Burnaby – 2025
  • 50-Storey Residential Tower, 6-Storey Offices, Community Hub and Underground Parking – Suitable Plan of Development
  • Project Team – Focus on Statistics
  • VAQ BC Wild Coast Exhibit Revitalization, Stanley Park, Vancouver, BC – 2025
  • Exhibit Revitalization
  • Project Team – Schematic Design, Design Development and Development Permit Drawings
  • King George Hub, Phase E, 13740 Fraser Highway, Surrey, BC – 2023–2024
  • 41-Storey Residential Tower with Underground Parking
  • Project Team – Building Permit and Construction Drawings, Consultant Coordination and Contract Administration
  • 13425 & 13455 107A Ave., Surrey, BC – 2023
  • Two-Tower Residential Building (50 Storeys West, 46 Storeys East), Retail and 5 Levels Underground Parking
  • Project Team – Focus on Statistics, Rezoning and Development Permit Applications
  • 1629 Scotia St., Vancouver, BC – 2022
  • Mixed-Use 8-Storey Office, Laboratory and Commercial Building, 3 Levels Underground Parking
  • Project Team – Development Permit Drawings, Consultant Coordination
  • The Commons at Royal Bay – Lot A, Latoria Blvd, Colwood, BC – 2021-2022
  • 5-Storey Wood-Frame Residential Building and Underground Parking
  • Project Team – Development Permit and Building Permit Drawings
  • The Commons at Royal Bay – Latoria Blvd, Colwood, BC – 2021-2022
  • Four Commercial Buildings, 2-Storeys, Concrete and Steel Structures
  • Project Team – IFC Drawings, Consultant Coordination and Contract Administration
  • 1468 Alberni St., Vancouver, BC – 2020
  • Passive House Two-Tower Residential Building (7-Storey Podium, 43-Storey West Tower, 48-Storey East Tower), Daycare, 6 Levels Underground Parking
  • Project Team – Building Permit Drawings
  • Weave Mixed-Use Development, Surrey, BC – 2019
  • Assisted Living Building, Care Building, Two-Storey Seniors’ Townhouses
  • Project Team – Development Permit Resubmission Drawings
  • PARC Victoria Senior Residence & Mixed-Use Development, Victoria, BC – 2019
  • Senior Residence and Mixed-Use Development
  • Project Team – Development Permit Resubmission Drawings
  • Seniors Independent Living Development, Chilliwack, BC – 2019
  • Independent Living Housing
  • Conceptual Design
  • Ewen Townhouse Development, New Westminster, BC – 2019
  • 9 Buildings, 3-Storey Wood-Frame Townhouses
  • Project Team – Construction Drawings
  • Intergulf Townhouse Development, Vancouver, BC – 2018-2019
  • 8 Buildings, 3-Storey Wood-Frame Townhouses, Underground Concrete Parking
  • Project Lead – Conceptual Design and Development Permit Submissions
  • Edgestone Townhouses, St. Johns Street, Port Moody, BC – 2017-2018
  • 8 Wood-Frame Buildings, 3-Storey Townhouse Development
  • Project Lead – Development and Building Permit Submissions to the City of Port Moody, Construction Documents, Contract Administration, coordination with client, consultants and contractor
  • French Street Townhomes, Vancouver, BC – 2017
  • Two Blocks of 2½-Storey Wood-Frame Townhouses, Underground Concrete Parking
  • Project Lead – Development and Building Permit Submissions
  • Westin Hotel at Calgary International Airport, AB – 2015-2016
  • 72,970 sf, 5-Storey Hotel & Conference Center
  • Project Lead – Schematic Design, Design Development, Development Permit Drawings; Airport Authority and Franchise submissions; Development and Building Permit Submission for City of Calgary; coordination with consultants, clients, Airport Authority, City of Calgary, and Franchise Authorities
  • ASAS Condominiums, Building 1, Surrey, BC – 2016
  • 6-Storey Wood-Frame Residential Building, Underground Parking
  • Project Team – Construction Drawings
  • Warehouse, Surrey, BC – 2015
  • 15,895 sf Warehouse, 3,054 sf Office
  • Project Lead – Schematic Design, Development Permit and Building Permit Submissions
  • Four Points by Sheraton Hotel, Sherwood Park, AB – 2014
  • 24,800 sf, 4-Storey Building
  • Project Team – Building Permit and Construction Drawings